Draft permit for Class I injection well operation in Port Charlotte.
Official courthouse record · Indexed in NoticeRegistry archive · AI-enriched for research
- Published
- Category
- Public Hearing
- City
- Port Charlotte
Research context
What to do next
- 1
Submit Comments
Send your written comments to the Department within 30 days of the notice.
- 2
Request Public Meeting
If interested, request a public meeting in writing within 30 days of the notice.
- 3
Contact for More Info
Reach out to James Dodson at 850-245-8653 for further details about the project.
Frequently asked questions
- What is the purpose of the draft permit?
- The draft permit is for a Class I injection well operation for wastewater disposal.
- How can I comment on the draft permit?
- You can submit written comments within 30 days of the public notice publication.
- Where can I find more information about the project?
- Additional information is available by contacting James Dodson at the Department of Environmental Protection.
The suggestions and answers above are AI-generated for general information only. They can be wrong, and we don't take responsibility for their accuracy. Talk to a qualified professional before acting on them.
Full Notice Text
State of Florida Department of Environmental Protection Notice of Draft Permit The Department of Environmental Protection hereby provides notice that it has prepared a draft permit for the proposed project as detailed in the application, subject to the conditions specified in the draft permit and summarized below. The applicant, Charlotte County Board of County Commissioners, Claire Jubb, Interim Utilities Director, 25550 Harborview Road, Suite 1, Port Charlotte, Florida 33980 applied on January 29, 2026, for a Class I injection well operation permit. The project is located at East Port Water Reclamation Facility, 3100 Loveland Boulevard, Port Charlotte, Florida 33980, in Charlotte County (File 0330486-005-UO/1M, WACS ID 71655). The permittee will operate one non-hazardous Class I injection well (IW-2) and associated monitor well (DZMW-1) for the disposal of domestic wastewater having received high-level disinfection from the East Port Water Reclamation Facility. The maximum injection rate for IW-2 shall be 5,250 gallons per minute and the maximum injection volume for IW-2 shall be 7.56 million gallons per day. The injection well is constructed with a 30-inch diameter steel casing set to 1,683 feet below land surface (bls), a 20-inch diameter steel casing set to 2,965 feet bls with a cemented annulus, and total depth of 3,246 feet bls. The injection zone is classified as a G-IV aquifer as defined in Rule 62-520.410 Florida Administrative Code. The dual-zone monitor well (DZMW-1) is completed in the Floridan aquifer from 1,422 to 1,494 feet bls and from 2,249 to 2,330 feet bls. The Department has permitting jurisdiction under Chapter 403 of the Florida Statutes and the rules adopted thereunder. The project is not exempt from permitting procedures. The Department has determined that an Underground Injection Control permit is required for the proposed work. Any interested person may submit written comments on the draft permit and may request a public meeting within 30 days after publication of this public notice. A request for a public meeting shall be submitted in writing and shall state the nature of the issues proposed to be raised in the meeting. If a public meeting is later scheduled, there will be another 30-day notice period for that meeting. Written comments or a public meeting request shall be submitted to the Department of Environmental Protection, Aquifer Protection Program, 2600 Blair Stone Road, MS 3530, Tallahassee, Florida 32399-2400, which is the office processing this permit application. All comments received within the 30-day period will be considered in formulation of the Departments final decision regarding permit issuance. The files associated with this order are available for public inspection during normal business hours, 8 a.m. to 5 p.m., Monday through Friday, except state holidays, at the Department of Environmental Protection, South District, and at the Department of Environmental Protection, Aquifer Protection Program office in Tallahassee. Any additional information concerning this project may be obtained by contacting James Dodson, Professional Geologist II, at 850-245-8653. Pub dates: 3/11/26, 3/18/26 163352 3984821
Related Notices
Notice
DateCategoryCity
Communications Committee Meeting scheduled for May 12th, 2026 at 9:00am.
May 5, 2026Public HearingPort Charlotte
Meeting to discuss community development district business on May 18, 2026.
May 1, 2026Public HearingPort Charlotte
Public auction for personal property on May 21, 2026, in multiple locations.
May 1, 2026Public HearingPort Charlotte