Bids for tuckpointing project due March 10, 2026, at Alden-Hebron High School.
Official Courthouse Record · AI-summarized for clarity
- Published
- Category
- Bid Notice
- City
- Hebron
What You Should Do Next
- 1
Download Bid Documents
Access the bidding documents starting February 24, 2026, from American Reprographics Company.
- 2
Attend Pre-Bid Meeting
Join the pre-bid meeting on March 2, 2026, at 3:00 p.m. at the school.
- 3
Prepare Bid Submission
Complete your bid forms and include the required certified check or bond.
- 4
Submit Bid by Deadline
Ensure your bid is submitted by 3:00 p.m. on March 10, 2026.
Frequently Asked Questions
- What is the deadline for submitting bids for the tuckpointing project?
- Bids are due by 3:00 p.m. on March 10, 2026.
- Where will the bids be opened?
- Bids will be publicly opened at Alden-Hebron High School, 9604 Illinois Street, Hebron.
- Is there a pre-bid meeting for the tuckpointing project?
- Yes, a non-mandatory pre-bid meeting is scheduled for March 2, 2026, at 3:00 p.m.
- What is required to submit a bid?
- Each bid must include a certified check or acceptable bidder's bond for 10% of the total bid.
The above suggestions and answers are AI-generated for informational purposes only. They may contain errors. NoticeRegistry assumes no responsibility for their accuracy. Consult a qualified professional before taking action.
Full Notice Text
PUBLIC NOTICE SECTION 00 11 13 ADVERTISEMENT FOR BIDS 2026 District-Wide HLS Tuckpointing Multiple Sites Hebron , Illinois 60034 Alden-Hebron School District 19 will receive single prime sealed bids for 2026 District-Wide HLS Tuckpointing project until 3:00 p.m. local time on March 10, 2026 at the Alden-Hebron High School, 9604 Illinois Street, Hebron, Illinois 60034, at which time and place all bids will be publicly opened and read aloud. Bidding documents, including the Proposal Form, Drawings and Specifications, will be provided to the following: Construction Data Company (ConstructConnect), (800) 652-0008, www.cdcnews.com Construction Market Data (ConstructConnect), (800) 424-3996, www.cmdgroup.com Dodge Data & Analytics, (877) 784-9556, www.construction.com Greater Peoria Contractors & Suppliers Association, (309) 692-5710, www.gpcsa.org iSqFt (ConstructConnect), (800) 364-2059, www.isqft.com Master Builders of Iowa, (800) 362-2578, www.mbionline.com Northern Illinois Building Contractors Association, (815) 229-5636, https://nibca.build/ This project includes: exterior tuckpointing and concrete repair at two (2) building sites. American Reprographics Company (www.e-arc.com), 640 North LaSalle Street, Suite 240, Chicago, Illinois, will have complete sets of the Bidding Documents to prospective bidders and subcontractors available for download through their Public Planroom under the "Print Center" link on their homepage. The Bid Documents will be available about February 24, 2026 . There is no cost to download the drawings, however, prospective bidders must provide all requested information when completing the download process in order that they will receive proper updates. A non-mandatory pre-bid meeting will be held on March 2, 2026 at 3:00pm. Contractors are to meet at the main entrance to Alden-Hebron High School at 9604 Illinois Street, Hebron, Illinois 60034. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Alden-Hebron School District 19 in an amount equal to ten percent (10%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. The successful bidder is required to pay the general prevailing wage for work as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and shall comply with all applicable Illinois statutory requirements regarding labor, including Equal Employment Opportunity laws. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before July 17, 2026. Board of Education Alden-Hebron School District 19 (Published in Northwest Herald Feb. 24, 2026) 2307066