Bids for roof construction at MES School Building due April 7, 2026.
Official Courthouse Record · AI-summarized for clarity
- Published
- Category
- Bid Notice
- City
- Clifton Springs
What You Should Do Next
- 1
Prepare Your Bid
Gather necessary documents and prepare your bid before the April 7, 2026 deadline.
- 2
Attend Pre-Bid Meeting
Join the pre-bid meeting on March 24, 2026, at 3:30 p.m. at the MES School.
- 3
Submit Bid Documents
Submit your completed bid documents by the deadline to ensure consideration.
- 4
Contact Project Manager
Reach out to Dan Blankenburg at (585) 409-4708 for any questions regarding the bid.
Frequently Asked Questions
- What is the deadline for bid submission?
- Bids must be submitted by 2:00 p.m. on April 7, 2026.
- Where can I obtain bid documents?
- Bid documents are available at Rotolite-Elliott Corporation in Pittsford, NY.
- Is there a pre-bid meeting?
- Yes, a pre-bid meeting is scheduled for March 24, 2026, at 3:30 p.m.
- What is the bid bond requirement?
- A bid bond of 5% of the bid amount is required with each submission.
The above suggestions and answers are AI-generated for informational purposes only. They may contain errors. NoticeRegistry assumes no responsibility for their accuracy. Consult a qualified professional before taking action.
Full Notice Text
SECTION 001113 – ADVERTISEMENT FOR BIDS Proposals for Phelps Clifton-Springs CSD (Midlakes CSD); Roof Construction (Contract No.101) at the MES School Building (Primary/Intermediate/Elementary School, Door 1) will be received by the Midlakes District Office (Located at Primary/Intermediate School, Enter in Door 20), 1490 State Route 488, Clifton Springs, NY 14432 until 2:00 p.m. local time on April 7, 2026. Bids will be opened and read aloud along with the identities of all Bidders. • Contract #101: Roof Construction Covid-19 Construction: To the extent required by SED guidance and other applicable law, construction shall continue as long as each contractor complies with social distancing requirements, cleaning and disinfecting protocols, testing and/or proof of vaccination requirements, and all applicable law and protocols in connection with COVID-19 exposure control at the job-site. The Instructions to Bidders, Form of Proposal, General Conditions and Supplements, Drawings, and Specifications may be obtained at Rotolite-Elliott Corporation, 1 Grove Street, PO Box 97, Pittsford, NY 14534 upon deposit of $100.00 per hardcopy set (make check payable to Midlakes CSD), and also available for a non-refundable $59.00 download (Paid directly to Rotolite if preferred). Drawings and Specifications will be available after 9 a.m. local time on March 16, 2026. Any Bidder upon returning such set in good condition within seven (7) days after the date set for Bid opening will be refunded the deposit. Midlakes CSD reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the Owner, all in accordance with applicable law. Midlakes CSD further reserves its right to disqualify Bidders for any material failure to comply with the “Instructions to Bidders”. A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the Bid, subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that in the case the contract is awarded to him, he will within ten (10) days thereafter, execute such contract and furnish a satisfactory Performance and Payment Bond, and that Bidder shall not withdraw his Bid for a period of forty-five (45) days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. NYS DOL Prevailing Wage applies to this project. The work is tax exempt. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed subject to and in accordance with the contract requirements. Pre-Bid Meeting: Occurs on Tuesday, March 24, 2026 at 3:30pm. • Arrival Location: MES School Building (Primary/Intermediate/Elementary School, Door 20) • Walkthrough: Pre-bid walkthrough Contact: • Construction Manager o Dan Blankenburg, Project Manager o Watchdog Building Partners o Ph: (585) 409-4708 • Architect o Joe Twomey, Sr. Project Manager o Edge Architecture, PLLC. o Ph: (585) 771-0447 The Midlakes CSD adheres to a policy of nondiscrimination on the basis of race, creed, color, disability, gender, national origin and other protected categories in employment, programs and services. Phelps-Clifton Springs Central School District 1490 State Route 488 Clifton Springs, NY 14432 Ryan Tilburg, Facilities Director