Sealed bids for Brungard Road upgrades due by March 11, 2026.
Official Courthouse Record · AI-summarized for clarity
- Published
- Category
- Bid Notice
- City
- New Springfield
What You Should Do Next
- 1
Prepare Your Bid
Complete the Proposal Guaranty and Performance/Payment Bond Form before the deadline.
- 2
Submit Your Bid
Deliver your sealed bid to the Springfield Township Administration Building by 2 PM on March 11, 2026.
- 3
Review Contract Requirements
Ensure compliance with wage rates and equal employment opportunity requirements outlined in the contract.
Frequently Asked Questions
- What is the deadline for submitting bids for the Brungard Road project?
- Bids are due by 2 PM on March 11, 2026.
- Where can I obtain the bidding documents for the project?
- Bidding documents can be obtained from Thomas Fok & Associates, Inc. for $50.
- What are the office hours for the Springfield Township Administration Building?
- The office hours are 8 AM to 2:30 PM, Monday through Friday.
The above suggestions and answers are AI-generated for informational purposes only. They may contain errors. NoticeRegistry assumes no responsibility for their accuracy. Consult a qualified professional before taking action.
Full Notice Text
BRUNGARD ROAD UPGRADES -PHASES 3 & 4 SPRINGFIELD TOWNSHIP, OHIO OHIO PUBLIC WORKS COMMISSION NOTICE TO BIDDERS The Board of Trustees of Springfield Township will receive sealed bids for the above-mentioned project until 2 PM on March 11, 2026 at the Springfield Township Administration Building, 3475 E. South Range Road, New Springfield, Ohio 44443. Please note that the Springfield Township Administration Building office hours are 8 AM to 2:30 PM Monday thru Friday. Bids will be publicly opened and read aloud March 11, 2026 at 6 PM during Trustees' meeting. Plans, specifications and bidding forms can be obtained only from Thomas Fok & Associates, Inc. at 3896 Mahoning Avenue, Youngstown, Ohio 44515, (330) 799-1501, for a fee of Fifty Dollars ($50.00) plus postage and handling, if applicable, for each set of Contract Documents and Drawings, which is non-refundable. Checks are to be made payable to Thomas Fok & Associates, Inc. PHASE 3 includes installation of 521' of 24" HDPE Pipe, 188' of 18" HDPE Pipe, one ODOT CB 2-2B Catch Basin, four ODOT 2-3 Catch Basins, one Concrete Headwall, and 31 SY of Tied Concrete Block Mat, Type 2, for erosion control. PHASE 4 includes installation of 1,143' of 18" HDPE Pipe, six ODOT CB 2-2B Catch Basins, and one ODOT 2-3 Catch Basin. Domestic Steel use requirements as specified in Section 153.011 of the Revised Code apply to this project. Copies of Section 153.011 of the Revised Code can be obtained from any of the offices of the Department of Administrative Services. Each bidder shall be required to complete and file with his bid the enclosed Proposal Guaranty and Performance/Payment Bond Form (Section 153.571 of the Ohio Revised Code) with a Surety Company executing the Bond, which is listed on the Treasury Department's most current list (Circular 570 as amended) and authorized to transact business in the State where the project is based. If the bid is accepted, the successful bidder shall enter into a contract and the Proposal Guaranty and Performance/Payment Bond shall provide the conditions in said bond, and as listed below: (A) A Contract Performance Bond in an amount equal to 100% of the estimated cost of the work conditioned, among other things that the Contractor will perform the work upon the terms proposed, within the time prescribed, in accordance with the plans and specifications. (B) A Payment Bond in an amount equal to 100% of the estimated cost of the work conditioned for the payment by the Contractor and all Sub-contractors for labor performed and materials furnished in connection with the project involved. Springfield Township reserves the right to reject any or all bids and waive any informalities in bidding. Bids of Corporations not chartered in Ohio must be accompanied by proper certification that such corporation is authorized to do business in Ohio. The successful bidder will be required to pay at least minimum wage rates pre-determined by the Secretary of Labor for the project work as required. The Schedule of Approved Wage Rates, as pre-determined by the Secretary of Labor is incorporated in the Contract Documents. This Contract is subject to the provisions of Executive Order 11246 of September 24, 1965, as pertains to an Affirmative Action Plan, and Governor Executive Order of January 27, 1972. A bidder/contractor will be deemed committed to the goals of Springfield Township Plan Bid Conditions by submitting a properly signed bid. All bidders must fill in all blanks of the proposal in ink or typewritten. Entire Contract Book must be submitted intact with the bid. The successful low bidder will be required to comply with all Contract Requirements for Equal Employment Opportunities. Each bidder must ensure that all employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. No bids may be withdrawn after the scheduled closing time for the receipt of bids for at least sixty (60) days. Engineer's Construction Cost Estimate: $352,000.00WORK WILL NOT COMMENCE UNTIL JULY 6, 2026 AND BE COMPLETE BY AUGUST 26, 2026. BY ORDER OF THESPRINGFIELD TOWNSHIP, OHIOGRANT WILLIAMSTOWNSHIP FISCAL OFFICER#317-2T-February 17,25, 2026#1234