Bids for boiler replacement at Chestnut Ridge High School due March 10, 2026.
Official Courthouse Record · AI-summarized for clarity
- Published
- Category
- Bid Notice
- City
- Fishertown
What You Should Do Next
- 1
Submit Your Bid
Ensure your bid is submitted by 10:00 a.m. on March 10, 2026.
- 2
Attend Prebid Conference
Join the prebid conference on February 26, 2026, at Chestnut Ridge High School Library.
- 3
Prepare Bid Guarantee
Include a bid guarantee of at least 10% with your bid submission.
- 4
Contact for Site Visit
Arrange site visits through Kelly Sparks at 814-839-4195 ext. 3340.
Frequently Asked Questions
- What is the deadline for bids for the boiler replacement?
- Bids are due by 10:00 a.m. on March 10, 2026.
- Where will the bids be opened?
- Bids will be opened in the District Administration Conference Room.
- Who can I contact for questions about the project?
- Contact Dorsey Wertz at dwertz@gatterdiehl.com for project inquiries.
- Is there a prebid conference for this project?
- Yes, a non-mandatory prebid conference is on February 26, 2026, at 3:30 p.m.
The above suggestions and answers are AI-generated for informational purposes only. They may contain errors. NoticeRegistry assumes no responsibility for their accuracy. Consult a qualified professional before taking action.
Full Notice Text
BID NOTICE ADVERTISEMENT FOR BIDS Sealed Bids for the Boiler Replacement at Chestnut Ridge High School will be received on a lump sum basis by Chestnut Ridge School District (Owner) at the District Administration Office, 3281 Valley Road, Fishertown, PA 15539 until 10:00 a.m. , local prevailing time, on Tuesday, March 10, 2026 . Bids for the above projects are invited in each of the following separate contract categories: Contract No. 1 - General Construction Contract No. 2 - HVAC Construction Contract No. 3 - Electrical Construction All bids so received will be publicly opened and read immediately afterward in the District Administration Conference Room . When arriving, all visitors are required to comply with sign-in and identification procedures established by the School District. The Engineer is Gatter & Diehl, Inc., 5 Corporate Drive, Suite 105, Bedford, PA 15522, Telephone (814) 623 5111. During the bidding period, questions regarding the project shall be e-mailed to the attention of Dorsey Wertz at dwertz@gatterdiehl.com. Complete bidding documents, in PDF electronic copy format, will be available from the Engineer at no cost. Hard copy will not be available from the Engineer. Please e mail Dorsey Wertz ( dwertz@gatterdiehl.com to request the bidding document. The Engineer assumes no responsibility for information derived from incomplete sets of documents or for issuing addenda to entities who obtain documents from sources other than the Engineer. Documents may be available at the following locations: Pennsylvania Builders Exchange (East and West), Pittsburgh & Harrisburg, PA; Altoona Builders Exchange, Altoona, PA; Lebanon County Builders Association, Lebanon, PA; Northeastern Pennsylvania Contractors Association (NEPCA), Pittston, PA; ConstructConnect; iSqFt Construction Software; The Blue Book Network; and Dodge Data & Analytics. A Non-Mandatory Prebid Conference will be held for prospective bidders Thursday, February 26, 2026, at 3:30 p.m. in the Chestnut Ridge High School Library , 2588 Quaker Valley Road, New Paris, PA 15554. Arrangements to otherwise visit the project site must be made through Kelly Sparks, Director of Facilities at 814-839-4195 ext. 3340. Each bid shall be accompanied by a bid guarantee in the form of a certified check, a cashier's check or a bid bond of an approved Surety Company in an amount of not less than ten percent (10%) of the amount of the bid. Check or bond shall be drawn in favor of Chestnut Ridge School District. Notice is given that this construction work for which bids are being solicited constitutes a public works project subject to applicable provisions of the Pennsylvania Prevailing Wage Act of August 15, 1961, P.L. 987. Appropriate prevailing minimum rates, as promulgated under provisions of said Act, must be paid by contractors in connection with performance of the necessary work. Notice is also given that this project is subject to the Pennsylvania Human Relations Act, the Act of October 27, 1955, P.L. 744, as amended and supplemented. Owner: Chestnut Ridge School District Mr. Kyle Kane, Superintendent February 20, 27 and March 6, 2026