Bids for running track construction due by March 25, 2026.
Official Courthouse Record · AI-summarized for clarity
- Published
- Category
- Bid Notice
- City
- Modesto
What You Should Do Next
- 1
Attend Pre-Bid Conference
Join the mandatory pre-bid conference on March 11, 2026, at 2:00 PM.
- 2
Submit Prequalification Application
Ensure your prequalification application is submitted before the deadline specified.
- 3
Prepare Bid Submission
Prepare your bid and submit it by mail or hand delivery by March 25, 2026.
- 4
Download Contract Documents
Access and download the contract documents starting March 10, 2026, from the district's website.
Frequently Asked Questions
- What is the deadline for submitting bids?
- Bids must be submitted by March 25, 2026, at 2:00 PM.
- Where is the pre-bid conference held?
- The pre-bid conference is at Baptist Elementary School, 1825 Cheyenne Way, Modesto.
- Who do I contact for more information?
- Contact Orlando Delgadillo at (209) 603-9034 or via email.
- What is required to bid on this project?
- Bidders must be prequalified and properly licensed by the California Contractors' State License Board.
The above suggestions and answers are AI-generated for informational purposes only. They may contain errors. NoticeRegistry assumes no responsibility for their accuracy. Consult a qualified professional before taking action.
Full Notice Text
Stanislaus Union School District Notice to Bidders Running Tracks – Baptist Elementary School, Chrysler Elementary School, Dieterich Elementary School, Eisenhut Elementary School & Prescott Junior High School Bid Instructions and Conditions This Contract is subject to prequalification. If a bidder is not prequalified to bid on the Contract, Owner will not accept the bid. Any subcontractors listed by the bidder for Work requiring Class A & B licenses must have current prequalified status with the Owner. The application for prequalification must be submitted to the Owner by the date specified in the application. The prequalification application may be obtained from the Owner. Summary of Work: Baptist ES, Dieterich ES, Eisenhut ES, & Chrysler ES: Construction of new 10 foot wide asphalt tracks (one at each site) with rubberized surfacing, with concrete curbs on both sides, in existing grass playfields. Prescott JHS: Construction of a new 6 lane asphalt track with rubberized surfacing, with concrete curbs on both sides, long jump runway and sandpit, high jump area, concrete pads for storage and bleachers, and storm drainage with drywells. To be installed in the current location of dirt track. District Contact: Orlando Delgadillo, Sr. Project Manager, Cumming Group, (209) 603-9034, Orlando.Delgadillo@Cumming-Group.com and cc Starbrina Times, Sr. Project Coordinator at Starbrina.Times@Cumming-Group.com Bids will be accepted via mail or hand delivered no later than March 25, 2026, at 2:00 PM at the District Office, 2410 Janna Ave., Modesto, CA 95350 – Attn: Facilities Department. Mandatory Pre-Bid Conference will be held March 11, 2026 at 2:00 PM for all (4) four sites starting at Baptist Elementary School located at 1825 Cheyenne Way, Modesto, CA 95356; interested contractors can access the Contract Documents, including the drawings and specifications, which may be obtained electronically from the Stanislaus Union School District Facilities Development Departments website beginning on March 10, 2026, at: https://www.stanunion.k12.ca.us/District/Portal/maintenance-operations, using the Current Bid Projects Tab; if you download the Contract Documents please email Starbrina Times at starbrina.times@cumming-group.com in order to be placed on the Project Plan Holders List. Only those bidders who attend this conference will have their bids considered for award. Schedule: Construction (90) Ninety Calendar Days. License: The bidder must be properly licensed by the California Contractors' State License Board. Contractors: Must be pre-qualified. Bonds & Insurance: Required. Prevailing Wage: Required Registration with DIR: Required Award of Agreement/Rejection of Bids: The District reserves the right to reject any or all bids. IPL0318609 Mar 4,11 2026
Related Notices
Notice
DateCategoryCity
Bids for running track construction due by March 25, 2026.
Mar 4, 2026Bid NoticeModesto
Seeking subcontractor bids for parking lot improvement project in Modesto.
Apr 8, 2026Bid NoticeModesto
Sealed bids are invited for the Modesto Library Shelving Project.
Apr 8, 2026Bid NoticeModesto