Draft permit for wastewater treatment facility operation in Tampa.
Official Courthouse Record · AI-summarized for clarity
- Published
- Category
- Public Hearing
- City
- St. Petersburg
- Case #
- FL0020940-030-DW1P/NR
View full case dossier
See all filings for case FL0020940-030-DW1P/NR with AI case status analysis.
What You Should Do Next
- 1
Review the draft permit
Examine the draft permit details available at the Southwest District Office.
- 2
Submit comments
Send your written comments to Emily Conaty by the deadline of 30 days from publication.
- 3
Request a public meeting
If desired, include a request for a public meeting in your comments.
Frequently Asked Questions
- What is the purpose of the draft permit?
- It authorizes the operation of a wastewater treatment facility in Tampa.
- How can I submit comments on the draft permit?
- Submit written comments to Emily Conaty at the specified address within 30 days.
- Where can I inspect the permit application file?
- The file is available at the Southwest District Office in Temple Terrace.
- What happens if I miss the comment deadline?
- Failing to submit comments within 30 days waives your right to comment.
The above suggestions and answers are AI-generated for informational purposes only. They may contain errors. NoticeRegistry assumes no responsibility for their accuracy. Consult a qualified professional before taking action.
Full Notice Text
STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION NOTICE OF DRAFT PERMIT The Department of Environmental Protection gives notice of its preparation of a draft permit to the City of Tampa, Eric Weiss, Wastewater Department Director, 2545 Guy North Verger Boulevard, Tampa, Florida 33605 for the Howard F. Curren Advanced Wastewater Treatment Plant (AWWTP). This permit authorizes the permittee to operate an existing domestic wastewater treatment facility, which would discharge 96.0 million gallons per day (MGD) Annual Average Daily Flow (AADF) of effluent to Hillsborough Bay (Upper). This permit also authorizes land application of 6.0 MGD of reclaimed water to a slow-rate public access system; and 2.3 MGD of reclaimed water to industrial reuse systems. The facility is located at latitude 27o 55 25.10 N, longitude 82o 26 14.26 W, at 2700 Maritime Blvd., Tampa, Florida 33605 in Hillsborough County. The Department has assigned permit file number FL0020940-030-DW1P/NR to the proposed project. The permit application file and supporting data are available for public inspection during normal business hours, 8:00 a.m. to 5:00 p.m., Monday through Friday, except legal holidays, at the Departments Southwest District Office, 13051 N Telecom Pkwy, Suite 101, Temple Terrace, Florida 33637-0926, at phone number (813) 470-5700 or via electronic correspondence at PublicRecordsRequests_Regulatory@floridadep.gov NOTICE OF RIGHTS The Department intends to issue the permit unless as a result of public comment appropriate changes are made. Written Comments or Request for Public Meeting Any interested person may submit written comments on the Departments proposed permitting decision or may submit a written request for a public meeting to Emily Conaty, 13051 N. Telecom Pkwy., Suite 101, Temple Terrace, Florida 33637-0926 or via electronic correspondence at SWD_WF_Permitting@floridadep.gov, in accordance with Rule 62-620.555, F.A.C. The comments or request for a public meeting must contain the information set forth below and must be received in the Departments Southwest District Office. The comments or request for a public meeting must contain the following information: (a) The commenters name, address, and telephone number; the applicants name and address; the Department permit file number; and the county in which the project is proposed; (b) A statement of how and when notice of the Departments action or proposed action was received; (c) A statement of the facts the Department should consider in making the final decision; (d) A statement of which rules or statutes require reversal or modification of the Departments action or proposed action; and (e) If desired, a request that a public meeting be scheduled, including a statement of the nature of the issues proposed to be raised at the meeting. If a public meeting is held, any person may submit oral or written statements and data at the public meeting on the Departments proposed action. As a result of significant public comment, the Departments final action may be different from the position taken by it in this draft permit. Time Period for Submitting Written Comments or Requesting a Public Meeting Comments submitted by any persons other than the applicant, and other Comments submitted by any persons other than the applicant, and other than those entitled to notice under Rule 62-620.550, F.A.C., must be received within 30 days of publication of the public notice. Failure to submit comments or request a public meeting within this time period shall constitute a waiver of any right such person may have to submit comments or request a public meeting under Rule 62-620.555, F.A.C. If a public meeting is scheduled, the public comment period is extended until the close of the public meeting. However, the Department may not always grant a request for a public meeting. Therefore, written comments should be submitted within 30 days of publication of this notice, even if a public meeting is requested. April 19 2026 85441
Related Notices
Notice
DateCategoryCity
Public meeting to adopt revised Board Rules at Pasco-Hernando State College.
Apr 19, 2026Public HearingSt. Petersburg
Budget workshop for Fiscal Year 2026-2027 operations and maintenance.
Apr 19, 2026Public HearingSt. Petersburg
Public hearing for marina site plan modification in St. Petersburg.
Apr 19, 2026Public HearingSt. Petersburg