RE-ADVERTISEMENT
Notice to Bidders
Sealed bids, subject to the conditions herein, will be received until 11:00 am, Wednesday May 20, 2026, at the Burlington-Alamance Regional Airport, 3441 North Aviation Drive, Burlington, North Carolina 27215 and then opened and publicly read for furnishing all labor and materials and performing all work connected with: AVGAS Fuel System Replacement – Package 2 (New Fuel System) as indicated in the plans and specifications prepared by Talbert & Bright, Inc. dated 2026.
IMPORTANT NOTICE TO BIDDERS: Each bidder for this project shall be registered as a prequalified bidder with the NCDOT at the time of bid opening. All subcontractors for the project should be registered as a pre-qualified subcontractor with the NCDOT at the beginning of the project. The proposed Contract for this project is subject to the Federal Contract Provision Requirements contained in Appendix ‘C' of the Contract Documents.
Prospective bidders should read the instructions for preparing bids in Section 20 of the project specifications carefully before submitting their bids.
Envelopes containing proposals must be sealed, addressed to Dan Danieley, President & CEO, Burlington-Alamance Regional Airport, 3441 N. Aviation Drive, Burlington, North Carolina 27215, and marked on the envelope as follows:
“PROPOSAL FOR AVGAS FUEL SYSTEM
REPLACEMENT
(PACKAGE 2
NEW FUEL SYSTEM)”
SPECIAL NOTE: As a condition of a grant award, the Sponsor, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4), 28 CFR § 50.3, and 49 CFR Part 21, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, all contractors will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of the owner's race, color, national origin, sex, creed, age, or disability in consideration for an award.
All contracts and subcontracts that result from this solicitation incorporate by reference the provisions of 29 CFR Part 201, et seq, the Federal Fair Labor Standards Act (FLSA), with the same force and effect as if given in full text. The FLSA sets minimum wage, overtime pay, recordkeeping, and child labor standards for full and part-time workers.
The Contractor has full responsibility to monitor compliance to the referenced statute or regulation. The Contractor must address any claims or disputes that arise from this requirement directly with the U.S. Department of Labor – Wage and Hour Division.
1t: 5/9/26