PUBLIC NOTICE
OF SIGNIFICANT INDUSTRIAL WASTEWATER VIOLATION(S)
IN THE SERVICE AREA OF THE NORTH SHORE WATER RECLAMATION DISTRICT
This notice complies with the public participation requirements of 40 CFR Part 25 in the enforcement of national pretreatment standards as required by the General Pretreatment Regulations: 40 CFR 403.8 (f)(2)(viii). All time frames referenced below include six months of data evaluated on a rolling calendar quarter basis as required by USEPA.
January 1, 2025 – June 30, 2025
April 1, 2025– September 30, 2025
July 1, 2025– December 31, 2025
October 1, 2025 – March 31, 2026
Listed below are the firms which had wastewater discharges that exhibited significant non-compliance as defined by Technical Review Criteria (TRC SNC) during one or more of the stated rolling six-month periods:
PurposeBuilt Brands, Gurnee: exceeded the permitted daily maximum Total Phosphorus limitation
Listed below are the firms which had wastewater discharges that exhibited significant non-compliance as defined by Chronic SNC during one or more of the stated rolling six-month periods.
PurposeBuilt Brands, Gurnee: exceeded the permitted daily maximum Total Phosphorus limitation
There were no firms which the District determined had adversely affected the operation or implementation of the local pretreatment program (40 CFR 403.8 (f)(2)(viii)(H)).
May 1, 2026
67983